screening of excavated material scope of work

SCOPE OF WORK StateEXTERNAL WORKS EXCAVATION BACKFILLING SITE

Scope of work General 1 Work area shall be cleaned of all debris at the end of each workday 2 The contractor shall provide materials safety equipment and all required tools and equipment to complete the project 3 The contractor shall provide work schedule showing starting andtrench excavation 40cm depth and 30 cm wide MR 18 92 Supply and install manhole for water valves to be constructed of reinforced concrete 100X100X100 cm and CI cover 25 Ton Price shall include for concrete steel plastering excavating backfilling and disposal of surplus excavated materials Excavation shall be in any type of soil or

با ما تماس بگیرید

Appendix 202 Regulated Waste Requirements PagesWork Procedure of Excavation at Construction Site

The Inspector shall field screen the excavated material for petroleum contamination using an organic vapor analyzer OVA At the discretion of the Inspector the excavated material which exhibits petroleum contamination shall be stockpiled and segregated while samples of the material are analyzed by an independent analytical laboratoryWork procedure for excavation at construction site involves understanding of centre line and excavation drawings setting out of plan on ground excavation of soil and removal of excess soil Quality checks such as recording ground level and marking of reference points should be done Excavation is

با ما تماس بگیرید

General Earthworks Specification Trench Excavation and Backfill rev 6 23 05

General Earthworks Specification 12 December of the Works and remove surplus excavated material off the Site He shall protect the exposed faces of the excavation with approved materials and lay all slope protection in proper and timely sequence to suit his method of constructionSECTION TRENCH EXCAVATION AND BACKFILL Scope of the construction work site at least 72 hours prior to construction to verify the and kept separate from general excavated materials and shall be replaced at the surface of the trench in back filling In lieu of removing and replacing sod the

با ما تماس بگیرید

6 Removal by Dredging and Excavation ITRCATTACHMENT “AA” DETAILED SCOPE OF WORK

67 Case Studies for Removal by Dredging and Excavation Numerous sediment removal case studies at different stages of completion were reviewed for this document and are summarized in Tables 6 2 and Table 6 3 A summary of dredged material handling at sediment remediation sites is provided in Table 6 4 In many of these case studies Attachment “AA” Detailed Scope of Work Demolition and Removal ITB DOT 12/13 LH 3 24 Monument signs shall encompass those signs constructed predominantly of concrete and masonry materials 25 Monopoles shall encompass billboards erected on a single steel pole

با ما تماس بگیرید

AMENDMENTS TO THE STANDARD SPECIFICATIONSSTATE OF WASHINGTON DEPARTMENT OF LABOR AND

AMENDMENTS TO THE STANDARD SPECIFICATIONS C2 Where selection of excavated material is required the method of excavation shall be so arranged as to avoid double handling Wherever possible excavated material CONSTRUCTON OF GALTON GATE WASTE TRANSFER STATION SCOPE OF WORK procuring the material No payment will be made for the removal requirements including the applicable scope s of work in connection with the delivery and bulldozing of material excavated from a public work site at various disposal sit Based on my review of the facts of this case and an analysis of applicable law it is my determination that the

با ما تماس بگیرید

DIVISION 2 Excavation Grading and BackfillCivil Construction ckyinc

11 WORK A Provide all related materials equipment and labor required to complete the work specified B All excavation trenching compaction backfill and landscaping shall be as listed in the Scope and as specified herein 12 QUALITY OF WORK A Provide experienced well trained workers competent to complete the work as specified BThe excavated material below elevation 5 foot NGVD was within the daily tidal range of the Napa River and required special care and The project scope of work called for road construction in the Los Padres National Forest Other activities included screening of materials from on site borrow sources to obtain required materials

با ما تماس بگیرید

Scope of Work Lead Based Paint Impacted Soil Remediation SECTION EARTHWORK Chattanooga

Scope of Work Lead Based Paint Impacted Soil Remediation Projects however the actual process will be left up to the contractor Field screening techniques including visual backfilling the excavation with clean material For the purposes of the cost estimate it should be assumed that the excavation SECTION EARTHWORK PART 1 GENERAL 101 SCOPE Excavation and trenching work shall include the removal and subsequent handling of all materials excavated or otherwise removed in performance of the contract work regardless of the type character composition or condition thereof

با ما تماس بگیرید

SCOPE OF WORK hacsjCHAPTER 2 EARTHWORK 21 SCOPE 22 GENERAL bjwsaorg

B HACSJ Scope of Work SOW Copiersdoc Page 2 of 8 operating and service instructions for the equipment shall be delivered with each unit Necessary warnings and safety precautions should be included 215 All pricing shall include tax and freight and shall be submitted where indicated on the Form of Bid document Separate price items 21 SCOPE Earthwork shall consist of all necessary site clearing and grubbing excavation and backfill for structures and trenches site grading grassing and restoration as well as related work as shown on the plans and as specified herein 22 GENERAL

با ما تماس بگیرید

Work Procedure of Excavation at Construction SiteGeneral Earthworks Specification

Work procedure for excavation at construction site involves understanding of centre line and excavation drawings setting out of plan on ground excavation of soil and removal of excess soil Quality checks such as recording ground level and marking of reference points should be doneGeneral Earthworks Specification 12 December of the Works and remove surplus excavated material off the Site He shall protect the exposed faces of the excavation with approved materials and lay all slope protection in proper and timely sequence to suit his method of construction

با ما تماس بگیرید

EARTHWORK AND SITE WORK nidwaterSolicitations Sacramento Municipal Utility District

EARTHWORK AND SITE WORK 18 1 General 18 101 Scope This section covers earthwork and site work Trench excavation backfill and trench surface restoration as well as clearing and grubbing are covered elsewhere in these specifications Materials shall be approved by the District Engineer they shall meet the requirements ofDUNS for Grant Solicitations Contact Us Useful Links SMUD Home Small Business Certification for the SEED Program JM Solicitation Status Closed Solicitation Title Station E Phase 1B Waste Excavation and Rough Grading PP Name Jesse Mays Phone 916 732 Email JesseMays smudorg Summary Work Location 151

با ما تماس بگیرید

6 Removal by Dredging and Excavation ITRCOVERVIEW SCOPE OF WORK SOW Vermont Business

61 Removal by Dredging and Excavation Background Information Dredging of harbors and rivers for navigational purposes has been practiced for centuries and studied extensively By comparison environmental dredging dredging for the sole purpose of removing contaminated sediment is a relatively new developmentOVERVIEW SCOPE OF WORK SOW however the soil is still under the TSCA non dilution non contact clause and needs disposal at a TSCA approved facility as the source was 75 ppm which is above the TSCA Hazardous designation of 50 ppm

با ما تماس بگیرید